NEWS & EVENTS
-
- Why do parents want their children to choose GTIIT
-
Choosing a university is not just a worry for the students themselves, parents are also involved. It is a problem for both students and parents after the college entrance examination. Why did our parents choose GTIIT as their children's dream university??Ms. Yang, a parent of a student from Biotechnology and Food Engineering in Cohort 2018, shared her knowledge, as well as suggestions and guidance......
- 2020-3-27
-
- Know more about GTIIT
-
How to find your dream university? You'd better try to know about it before you make decisions.?GTIIT Admissions Office brought the second live broadcast on the evening of March 20. Mr. Lin Le from the Office, introduced the university and its admissions policies.?Please follow me to know more about GTIIT.About GTIITGuangdong Technion-Israel Institute of Technology (GTIIT) is a Sino-foreign cooper...
- 2020-3-24
-
- Remote learning experience at GTIIT
-
As the opening of spring semester has been postponed due to the coronavirus outbreak, GTIIT has officially launched the phase 1 remote teaching period since Mar 5. Except for the lab courses, which are not applicable to the remote teaching, a total of 22 courses have been offered.GTIIT introduces the excellent academic tradition of "L & T" from the Technion, a teaching model which fully exploit th......
- 2020-3-23
-
- Campus life at GTIIT
-
As a brand-new campus, Guangdong Technion Israel Institute of Technology remains a mystery for many students. In order to show a more real and comprehensive image of GTIIT, we have launched a series of online sharing activities since March 17. In the first episode, we invited Wang Yuxin, a student majoring in Chemical Engineering, Class of 2022, to unveil the mystery of the campus at the broadcast......
- 2020-3-20
-
- 100%! Construction site of South Campus of GTIIT was fully restored.
-
Spring is come at the appointed time in 2020, the construction project of GTIIT Phase II (South Campus) has been fully restored.After 14 days of quarantine, all 160 workers have joined in the campus construction. At present, the gymnasium has completed the structural construction of the basement; the first floor is under construction. Two 12-story apartment buildings have their roofs capped and ar......
- 2020-3-19